Scale your inference.

Nodiac develops, on average, 2 to 20 MW sites at distribution-level interconnections with rapid paths to power, fiber, and permits.

Bring your own pod, or take it turnkey

Energized Site

A pad-ready site with power, fiber, and permit in place. You bring your own small modular compute (SMC) pod and operate it; we retain site-level maintenance.

Turnkey

The same site plus the SMC pod, financed, installed, and operated by Nodiac: 24/7 NOC, security, and maintenance included.

The path to live capacity

1

Site match

We map your capacity, geography, and spec requirements against the screened portfolio.

2

One agreement

A single MCA with per-site schedules. Add sites without renegotiating.

3

Energization

Site control, utility agreement, and permits, run by a team that has done it hundreds of times. Module procurement starts in parallel.

4

Capacity online

Energized Site: pad, power, and fiber handed off to your team. Turnkey: pod installed, NOC live, capacity accepted.

Request a portfolio review

We will walk through available sites, interconnection status, and timelines against your procurement plan.

Contact us