
AI needs power now.We deliver in months, not years.
We deploy modular data centers at sites with immediate power availability. Inference compute online faster than any traditional build.
0 MW+
Pipeline Capacity
0 +
Sites Identified
0 TWh
Curtailed Annually
0 GW+
AI Demand by 2030
Our Five Pillars
Speed-to-Power
Distribution-level interconnects skip the queue. No multi-year wait for transmission.
Proven Sites
Pre-screened locations with land, power, and permits already in place.
Built to Scale
1–15 MW per site, modular and repeatable. Add capacity rapidly based on power availability.
Win-Win Economics
New revenue for site owners, near-term capacity for hyperscalers.
Clean Energy Path
Grid power first for reliability, with renewables augmentation built in.
Site Selection
Power Connection
Deploy Infrastructure
Inference Compute Online
Built on $26B+ in energy projects
Our team comes from Greenbacker, Acciona Energy, and Invenergy.
We've developed, financed, and operated power assets across the country. We know how to navigate interconnection, permitting, and utility relationships because we've done it hundreds of times.
The infrastructure gap
AI demand is outpacing the grid's ability to deliver new capacity.
Billions in data center projects are stuck waiting for transmission-level interconnection. Hyperscalers need inference compute now, but the traditional development timeline doesn't match the urgency.
The Nodiac approach
We go where the power already is.
Instead of waiting for new grid capacity, we co-locate at sites that already have power, land, and permits. The same playbook that scaled renewable energy — applied to AI infrastructure.
For IPPs, Utilities & Co-ops
Turn your existing power sites into high-value AI infrastructure. We handle development and operations — you unlock new revenue from assets you already own.
Increase Revenue per MW
Data center hosting generates up to 7x the revenue of traditional power sales. Make your existing assets work harder and worth more.
No Cash Equity Required
Nodiac funds development and deployment. Your contribution is the site and power access.
Existing Interconnection Untouched
We don't modify your interconnection agreements or disrupt existing assets. This is additive revenue on top of what you already have.
Minimal Disruption
We work around your existing operations. Modular deployment means no major construction. JV structure with long-term alignment.
